1 to 2 of 2
Sort by: Date | Relevance
A. Setting up, flagging, and inspecting a crane B. Inspecting rigging properly C. Running a site level D. Checking in truck deliveries against bill of lading when load arrives E. Counting bars and bundles of rebar, dobies, and wire mesh F. Directing forklift/crane to unload delivery truck G. Shaking out rebar and distributing/organizing accordingly H. Using pliers to tie
Posted 1 day ago
A. Receiving and offloading all major components B. Installing loose components for Nacelle, hub, and tower preparation C. Connecting blades to hub D. Setting base and tower sections E. Managing taglines F. Involved with main erection crane assembly and teardown G. Climbing ladders average 80m H. Drilling and/or tapping of all holes on turbines, generators, compressors, a
Posted 1 day ago
Email this Job to Yourself or a Friend
Indicates required fields